Well it is at least a little cleaner....
Friday, May 11, 2007
Work to be done before launching.
1) Bath and wax.
2) Some electrical work (took a lightning strike a number of years ago)
3) New hole in hull for depth finder unit.
4) Install new GPS system (Garmen GPSMAp 230) Yes I know it is not "new" but it is still in the box....
We will also need to have it re measured for a PHRF rating, as the last one is about 10 years old.... And for those of you who ask, "What's it rate?" well the last rating was 132.
2) Some electrical work (took a lightning strike a number of years ago)
3) New hole in hull for depth finder unit.
4) Install new GPS system (Garmen GPSMAp 230) Yes I know it is not "new" but it is still in the box....
We will also need to have it re measured for a PHRF rating, as the last one is about 10 years old.... And for those of you who ask, "What's it rate?" well the last rating was 132.
Money shot
Boom, um, boom...
Trapped!
Subscribe to:
Posts (Atom)